Summary

  • T1_01__CIGRE 273 : Planning for the Integration of HVDC Facilities
  • T1_02__CIGRE 277 : Design Aspects of the Eastern Alberta Transmission Line HVDC Project
  • T1_03__CIGRE 266 : Converter Technologies and Functional Requirements for Reliable and Economical HVDC Grid Design
  • T1_04__CIGRE 267 : SVC Design and Installation for Voltage Stability Enhancement
  • T1_05__CIGRE 312 : A Program for Automation of the Harmonic Impedance Calculations Required for the Specification of HVdc Links
  • T1_06__CIGRE 249 : Electromagnetic Transient Overvoltage Study of a Multi-Terminal VSC based HVDC System
  • T1_07__CIGRE 221 : Building a HVDC Bipole Scheme from one LCC Pole and one VSC Pole
  • T1_08__CIGRE 265 : An Ultra-fast Disconnecting Switch for a Hybrid HVDC Breaker
  • a technical breakthrough
  • T1_09__CIGRE 308 : Assessment of HVDC Transmission Line Transposition on Induction Issues due to AC/DC Lines Coupling in Common Transmission Corridors
  • T1_10__CIGRE 229 : The Service Reliability of Aging Power Transformers
  • T1_11__CIGRE 253 : Second Generation Computerized Maintenance Management Systems: A Critical Asset Management Tool
  • T2_01__CIGRE 231 : World’s First Deployment of Line Current Differential Protection (LCDP) Using Broadband Power Line Carrier (B-PLC) Technology
  • T2_02__CIGRE 256 : Protection Challenges and Solutions for Lines With Multiple Taps
  • T2_03__CIGRE 340 : Simplifying Protection System Design for Distribution Substations
  • T2_04__CIGRE 310 : IEC61850-9-2 Process Bus Implementation on IEDs
  • T2_05__CIGRE 306 : Comprehensive Functional Testing of a Synchrophasor Data Concentrator
  • T2_06__CIGRE 318 : SINGLE-POLE TRIP AND RECLOSE PRACTICAL CONSIDERATIONS AND INDUSTRY PRACTISE
  • T2_07__CIGRE 245 : Pipe-type cable failure Caused by Lightning & Water Induced Sand Blasting
  • T2_08__CIGRE 241 : Development of Fibre Reinforced Polymer Composite Cross Arms for Sustaining Transmission Lines
  • T2_09__CIGRE 234 : Locating Oil Leaks in the Submarine Power Cable Crossing the
  • Northumberland Strait
  • T2_10__CIGRE 316 : RESISTIVE SUPERCONDUCTOR FAULT CURRENT LIMITER DESIGN AND APPLICATION FOR EXTENDING CRITICAL ASSET LIFE
  • T2_11__CIGRE 208 : Leveraging Graphical System Design, Reconfigurable Hardware, and Knowledge Management to Develop an Advanced Asset Monitoring System for Large Hydro Generator
  • T3_01__CIGRE 240 : Harmonics from Home Appliances
  • T3_02__CIGRE 255 : AmpaCity Project – Advanced Superconducting 10 kV System Replaces Conventional 110 kV Cable System in City Center
  • T3_03__CIGRE 296 : Self-healing of Power Distribution Networks: Techniques and Deployment Challenges
  • T3_04__CIGRE 237 : Prioritizing Maintenance for Protection Assets (PA): Utilizing Decision Indices
  • T3_05__CIGRE 213 : Non-invasive acoustic testing and monitoring of power transformers
  • T3_06__CIGRE 333 : Non-Linear Finite-Element Analysis of Conductor Cables with Composite Core Mechanical Behavior
  • W1_01__CIGRE 319 : New Technological Approach to Simplify Pole Loading and CSA Structural Analysis Requirements
  • W1_02__CIGRE 235 : A Real Time Environment for Closed-Loop Testing of PMU-based WACS Schemes
  • W1_03__CIGRE 225 : Impact of transmission line transpositions onnegative sequence voltage unbalance
  • W1_04__CIGRE 254 : Planning for a New 500 kV Substation in Manitoba
  • W1_05__CIGRE 337 : Methods for Risk Assessment of SSCI Stability Issues Between RenewableGeneration and Series Compensated Transmission Systems
  • W1_06__CIGRE 271 : An On-line Distributed Slack Bus Model for the Interconnection of AlbertaPower Grid and WECC
  • W1_07__CIGRE 215 : Feeder Differential Protection over EPON for Smart Distribution Networks
  • W1_08__CIGRE 238 : Utilization of Histogram in Control of Aggregated Loads with Innate Storage
  • W1_09__CIGRE 284 : Integrated Tool for Static and Dynamic Security Assessment of Large Power Systems
  • W1_10__CIGRE 325 : Remedial Action Scheme Philosophies and Montana-Alberta Tie-Line
  • W2_01__CIGRE 239 : Advanced Tap Changer Control of Parallel Transformers based on IEC 61850 GOOSE Service
  • W2_02__CIGRE 344 : Version Control and Patch Management of Protection and Automation Systems
  • W2_03__CIGRE 338 : A study on effect of CT saturation on Low power CT/VT operateddigital over current relays
  • W2_04__CIGRE 218 : Does 1 + 1 = Redundancy?
  • W2_05__CIGRE 331 : Big Data = Big Challenges for Big Substations and Big Assets
  • W2_06__CIGRE 321 : Multi-Function High-Voltage Sensors – Key to Enhanced Power System Operation and Automation – a Technology Adoption Roadmap
  • W2_07__CIGRE 341 : Lessons Learned: Implementing an IEC 61850 Based Substation AutomationSystem
  • W2_08__CIGRE 332 : Substation Control and HMI at BC Hydro – Past, Present and Future
  • W2_09__CIGRE 242 : Clarifying the Impact of Meshed Conductors and AdditionalGrounding on Creating an Equipotential Zone
  • W2_10__CIGRE 274 : Estimating Ground Clearance Required for Induction on Vehicles
  • W3_01__CIGRE 289 : Performance evaluation and simulation of WiMAX capacity for distribution automation
  • W3_02__CIGRE 314 : Cognitive Radio for Smart Grid
  • W3_03__CIGRE 307 : Reliable Network Design and Architectures for Modern P&C Systems
  • W3_04__CIGRE 226 : An Ethernet Multiplexer for Protection and Control A CFE Case Study
  • W3_05__CIGRE 294 : Paradigm shift required to digitze modern grid
  • W3_06__CIGRE 283 : Using IEC61400-25 and IEC 61131 to Process Wind Farm Data

Additional informations

Publication type Colloquia
Reference COLL_CAL_2013
Publication year 2013
Publisher CIGRE National Committee
Price for non member Free
Price for member Free
Colloquium - Calgary 2013
Colloquium - Calgary 2013