You're using an outdated browser. This website will not display correctly and some features will not work.
Learn more about the browsers we support for a faster and safer online experience.

O. Reg. 474/21: GRANTS FOR STUDENT NEEDS - LEGISLATIVE GRANTS FOR THE 2020-2021 SCHOOL BOARD FISCAL YEAR

filed June 15, 2021 under Education Act, R.S.O. 1990, c. E.2

Skip to content

Français

ontario regulation 474/21

made under the

Education Act

Made: May 20, 2021
Filed: June 15, 2021
Published on e-Laws: June 15, 2021
Printed in The Ontario Gazette: July 3, 2021

Amending O. Reg. 489/20

(GRANTS FOR STUDENT NEEDS - LEGISLATIVE GRANTS FOR THE 2020-2021 SCHOOL BOARD FISCAL YEAR)

1. Subsection 9 (1) of Ontario Regulation 489/20 is amended by adding the following paragraph:

20.3  Memorandum 2021 B12: COVID-19 Resilience Infrastructure Stream: Education Related (CVRIS-EDU) Projects - Approvals, dated May 7, 2021.

2. Section 58 of the Regulation is amended by adding the following paragraph:

7.2  The COVID-19 resilience infrastructure stream amount.

3. The Regulation is amended by adding the following section:

COVID-19 resilience infrastructure stream amount

65.2 (1) The COVID-19 resilience infrastructure stream amount is the total of the amounts determined as follows for the projects set out for the board in Column 3 of the Table to this section:

1.  Determine the amount of eligible expenditures for the project that the board incurred during the period beginning on the date specified in Column 4 of the Table to this section and ending on August 31, 2021, as set out in the document entitled “Memorandum 2021 B12: COVID-19 Resilience Infrastructure Stream: Education Related (CVRIS-EDU) Projects - Approvals,” dated May 7, 2021.

2.  Take the lesser of the amount determined under paragraph 1 and the amount specified for the project in Column 5 of the Table to this section.

(2) It is a condition of the payment of a grant to a board under this Regulation that the board comply with the requirements set out in the document entitled “Memorandum 2021 B12: COVID-19 Resilience Infrastructure Stream: Education Related (CVRIS-EDU) Projects - Approvals,” dated May 7, 2021.

TABLE

Item

Column 1
Name of Board

Column 2

Project Identification Number

Column 3

Project title

Column 4

Project start date

Column 5

COVID-19 resilience infrastructure stream amount,

in dollars

1.

Algoma District School Board

N2-4

Touchless Water Bottle Filling Stations; Handwashing Features

February 18, 2021

 140,000

2.

Algoma District School Board

N2-3

Ventilation and/or HVAC Upgrades; Touchless Water Bottle Filling Stations and Flush Valves

February 19, 2021

 1,055,000

3.

Algoma District School Board

N2-2

Ventilation Upgrades - Mountain View, Windows

February 18, 2021

 565,000

4.

Algoma District School Board

N2-1

Ventilation Upgrades and Childcare Space Retrofits, Windows

February 18, 2021

 2,675,000

5.

Algonquin and Lakeshore Catholic District School Board

N55-1

Ductwork and Classroom Unit Ventilation Installation

February 18, 2021

 950,000

6.

Algonquin and Lakeshore Catholic District School Board

N55-4

Ductwork Installation; HVAC Installation; Water Bottle Fill Station

February 18, 2021

 722,500

7.

Algonquin and Lakeshore Catholic District School Board

N55-3

HVAC/Ductwork/BAS Installation; Automatic Door Operators; Handwashing Stations; Water Bottle Filling Stations

February 19, 2021

 2,603,000

8.

Algonquin and Lakeshore Catholic District School Board

N55-2

Installation of Classroom Unit Ventilation

February 18, 2021

 200,000

9.

Avon Maitland District School Board

N8-3

HVAC Upgrades (Improve Air Quality); Water Bottle Filling  Station; Hands Free Bathroom Fixtures (Sinks)

February 18, 2021

 1,836,000

10.

Avon Maitland District School Board

N8-4

HVAC Upgrades (Improve Air Quality); Water Bottle Filling  Station; Hands Free Bathroom Fixtures (Sinks)

February 18, 2021

 1,027,000

11.

Avon Maitland District School Board

N8-1

Wireless Infrastructure

February 18, 2021

 109,666

12.

Avon Maitland District School Board

N8-2

Wireless Infrastructure

February 18, 2021

 1,843

13.

Bluewater District School Board

N7-3

HVAC Upgrades (Air Quality Optimization); Touchless Water Bottle Filling Station; Touchless Handwashing Station

February 18, 2021

 2,449,000

14.

Bluewater District School Board

N7-2

Network

February 18, 2021

 28,000

15.

Bluewater District School Board

N7-1

Network Switches

February 18, 2021

 917,500

16.

Bluewater District School Board

N7-4

Touchless Water Bottle Filling Station; Touchless Handwashing Station; Classroom Partitions

February 18, 2021

 53,000

17.

Brant Haldimand Norfolk Catholic District School Board

N51-1

HVAC Upgrades (Ventilation); Physically Distant Full-Day Kindergarten Classrooms; Bottle Water Filling Stations; Portable Replacement; Open Concept Schools

February 18, 2021

 1,600,000

18.

Brant Haldimand Norfolk Catholic District School Board

N51-2

Wi-Fi Access Points; Touchless Door Handles; Daycare Improvements (Installation/Replacement t of Sinks, Exterior Door, Washrooms, Vestibule)

February 18, 2021

 436,235

19.

Bruce-Grey Catholic District School Board

N35-1

Water Bottle Filling Stations; External Wi-Fi Access Points

February 19, 2021

 305,531.9

20.

Catholic District School Board of Eastern Ontario

N52-2

HVAC; Other Improvements to Air Quality & Duct Sealing; Water Bottle Filling Station; Fence

February 18, 2021

 4,328,820

21.

Catholic District School Board of Eastern Ontario

N52-1

Mechanical Upgrade to RTUs and VAV

February 18, 2021

 30,000

22.

Catholic District School Board of Eastern Ontario

N52-3

Water Bottle Filling Station

February 18, 2021

 3,000

23.

Conseil des écoles publiques de l’Est de l’Ontario

N59-1

HVAC Upgrades; Water Bottle Filling Stations; Washroom Faucet Replacements

February 18, 2021

 3,914,000

24.

Conseil des écoles publiques de l’Est de l’Ontario

N59-3-MR

Water Bottle Filling Stations Project Group

March 18, 2021

 66,000

25.

Conseil des écoles publiques de l’Est de l’Ontario

N59-2

Water Bottle Filling Stations; Washroom Faucet Replacements

February 18, 2021

 55,000

26.

Conseil scolaire catholique MonAvenir

N64-1

Washrooms Renovations; A/C; Automatic Bottle Water Filling Station; Hold Open Fire Doors

February 18, 2021

 8,782,425

27.

Conseil scolaire catholique Providence

N63-1

Water Bottle Filling Station; Secured Access

February 18, 2021

 415,800

28.

Conseil scolaire de district catholique de l’Est ontarien

N65-1

Retrofits to reconfigure space

February 18, 2021

 40,000

29.

Conseil scolaire de district catholique de l’Est ontarien

N65-2

Touchless Water Fountain; Renovations to reconfigure space; Replacement of MERV 13 HVAC Unit; Other Improvements to Air Quality and duct sealing

February 18, 2021

 4,422,029

30.

Conseil scolaire de district catholique de l’Est ontarien

N65-3

Touchless Water Fountain; Replacement of MERV 13 HVAC Unit; Other Improvements to Air Quality and duct sealing

February 18, 2021

 621,777

31.

Conseil scolaire de district catholique des Aurores boréales

N62-1

Improvements to HVAC Systems; Touchless Faucets

February 18, 2021

 321,000

32.

Conseil scolaire de district catholique des Aurores boréales

N62-2

Improvements to HVAC Systems; Touchless Faucets

February 18, 2021

 53,500

33.

Conseil scolaire de district catholique des Grandes Rivières

N60.1-1

Boiler Replacement

February 18, 2021

 800,000

34.

Conseil scolaire de district catholique des Grandes Rivières

N60.1-2

Boiler Replacement

February 18, 2021

 750,000

35.

Conseil scolaire de district catholique des Grandes Rivières

N60.1-3

Water Bottle Filling Station; HVAC System; Windows; Vestibule; Interior/Exterior Doors; Heating, Ventilation, A/C; Washrooms Renovations; Secured Access; Handwashing Stations with Touchless Faucet

February 18, 2021

 3,129,200

36.

Conseil scolaire de district catholique des Grandes Rivières

N60.1-4

Water Bottle Filling Station; Window and Siding; Heating, Ventilation, A/C; Secured Access; Handwashing Station

February 18, 2021

 990,700

37.

Conseil scolaire de district catholique du Centre-Est de l’Ontario

N66-3-MR

Bottle Water Filling Stations Project Group

March 18, 2021

 4,000

38.

Conseil scolaire de district catholique du Centre-Est de l’Ontario

N66-2

Bottle Water Filling Stations; Ventilation Improvements Group

February 18, 2021

 120,000

39.

Conseil scolaire de district catholique du Centre-Est de l’Ontario

N66-1

Ventilation Improvement

February 18, 2021

 8,800,000

40.

Conseil scolaire de district catholique du Nouvel-Ontario

N61-3

Bottle Water Filling Station; Improving Child Care Entrance

February 19, 2021

 185,000

41.

Conseil scolaire de district catholique du Nouvel-Ontario

N61-4

Drinking Water Bottle Filling Station

February 18, 2021

 51,000

42.

Conseil scolaire de district catholique du Nouvel-Ontario

N61-1

Optimizing Air Quality

February 18, 2021

 595,000

43.

Conseil scolaire de district catholique du Nouvel-Ontario

N61-2

Optimizing Air Quality

February 18, 2021

 560,000

44.

Conseil scolaire de district catholique Franco-Nord

N60.2-1

Touchless Plumbing & Child Care Main Entrance Projects

February 18, 2021

 27,000

45.

Conseil scolaire de district catholique Franco-Nord

N60.2-2

Window Replacement & Installation of Mechanical Ventilation

February 18, 2021

 1,850,000

46.

Conseil scolaire de district du Nord-Est de l’Ontario

N56-1

HVAC; Installation of Touchless Faucets

February 18, 2021

 475,000

47.

Conseil scolaire de district du Nord-Est de l’Ontario

N56-2

Modernizing HVAC Control System

February 18, 2021

 75,000

48.

Conseil scolaire de district du Nord-Est de l’Ontario

N56-4

Replacement of a Drinking Water Fountain with a H2O Station

February 18, 2021

 5,000

49.

Conseil scolaire de district du Nord-Est de l’Ontario

N56-3

Washroom Renovation; HVAC; H2O/Drinking Station

February 18, 2021

 200,500

50.

Conseil scolaire public du Grand Nord de l’Ontario

N57-1

Ventilation; Reducing Points of Contact

February 18, 2021

 1,685,000

51.

Conseil scolaire public du Grand Nord de l’Ontario

N57-2

Ventilation; Reducing Points of Contact

February 19, 2021

 925,000

52.

Conseil scolaire Viamonde

N58-3

Bottle Water Filling Station

February 18, 2021

 39,000

53.

Conseil scolaire Viamonde

N58-1

HVAC Upgrades

February 19, 2021

 8,905,000

54.

Conseil scolaire Viamonde

N58-2

Window Replacement; HVAC

February 18, 2021

 2,080,000

55.

District School Board of Niagara

N22-2

Automatic Door Openers; Door Hold Open Devices; Water Bottle Filling Stations

February 18, 2021

 3,252,225

56.

District School Board of Niagara

N22-1

HVAC Upgrades; Handwashing and Washroom Improvements; Online Learning Support; New Portables; Building Ventilation Controls - Optimizing Air Quality; Creating New Classroom Spaces

February 18, 2021

 9,789,000

57.

District School Board Ontario North East

N1-3

In-duct Air Purification System and/or HVAC Upgrade; Water Bottle Filling Stations; Handwashing Stations

February 18, 2021

 1,923,172

58.

District School Board Ontario North East

N1-1

Ventilation Upgrades

February 18, 2021

 2,870,000

59.

District School Board Ontario North East

N1-4

Ventilation Upgrades; Water Bottle Filling Stations; Entrance Vestibules, Washrooms

February 18, 2021

 816,453

60.

District School Board Ontario North East

N1-2

Ventilation Upgrades; Window Replacement

February 18, 2021

2,040,000

61.

Dufferin-Peel Catholic District School Board

N43-1

Air Handling Replacement Project Group 1

February 18, 2021

 9,820,000

62.

Dufferin-Peel Catholic District School Board

N43-2

Air Handling Replacement; Water Bottle Filling Stations; Exhaust Fan and Boiler Replacement

February 18, 2021

 5,710,000

63.

Dufferin-Peel Catholic District School Board

N43-3

Security Access (Video Entry System); Wi-Fi Access Points and Network Infrastructure; Portable Replacement; Handwashing Stations; FDK (exterior access, outdoor playground)

February 18, 2021

 9,076,595

64.

Durham Catholic District School Board

N45-2

Gym Partitions; Accessible Door Operators; Expand Shared Kindergarten and Childcare Outdoor Space

February 18, 2021

 390,000

65.

Durham Catholic District School Board

N45-1

Wi-Fi Access Points; Window replacement; HVAC Upgrades; Water Bottle Filling Stations; Sink Replacements

February 18, 2021

 7,052,675

66.

Durham District School Board

N13-3

Outdoor Classrooms; Replacement of Portable Classrooms

February 18, 2021

 4,750,000

67.

Durham District School Board

N13-2

Ventilation Upgrades; Window Replacements; Exterior Door Fobs Access; Water Bottle Filling and Hand Sanitizing Stations; Childcare Vestibules; Plexiglass Partitions; Fencing

February 18, 2021

 9,522,700

68.

Durham District School Board

N13-1

Wireless Infrastructure Upgrade Project Group – Wi-Fi Access Points

February 18, 2021

 3,317,660

69.

Grand Erie District School Board

N23-2

Enclosing Open Concept Classrooms; HVAC; Water Bottle Filling Station; Hallway Door Hold Open Devices; Entrance Door Security Access

February 18, 2021

 8,869,500

70.

Grand Erie District School Board

N23-1

Portable Replacement

February 18, 2021

 1,200,000

71.

Greater Essex County District School Board

N9-2

HVAC upgrades (Mechanical Ventilation)

February 18, 2021

 8,898,313

72.

Greater Essex County District School Board

N9-1

Ventilation Renewal Project; Create Cooling Centre

February 18, 2021

 2,960,917

73.

Greater Essex County District School Board

N9-3

Water Bottle Filling Stations

February 18, 2021

 8,453

74.

Greater Essex County District School Board

N9-4

Wi-Fi Access Points; Hold Open Door Installations; Upgrades to Child Care Spaces; Water Bottle Filling Stations

February 18, 2021

 3,695,275

75.

Halton Catholic District School Board

N46-2

Child Care Centre Improvements

February 18, 2021

 14,000

76.

Halton Catholic District School Board

N46-1

HVAC Improvements; Window Replacements; Water Bottle Filling Stations; Washroom Upgrades; Power Door Operators; Entrance Door Security; Child Care Centre
Improvements;  Wi-Fi Access Points and Network Infrastructure

February 18, 2021

 6,778,719

77.

Halton District School Board

N20-3

Outdoor Seating/Learning Spaces; Childcare Retrofits

February 18, 2021

 3,489,688

78.

Halton District School Board

N20-1

Portable Classroom Ventilation Improvements; HVAC Improvements; Window Replacement

February 18, 2021

 7,125,000

79.

Halton District School Board

N20-2

Replacement of Access Points; Open Concept Schools; Building Automation Systems and Control Upgrades; Child Care Retrofits and Outdoor Spaces

February 18, 2021

 8,794,194

80.

Hamilton-Wentworth Catholic District School Board

N47-2

HVAC Upgrades; Water Bottle Filling Stations; Partition Classroom Spaces; Automatic Door Opener Installations; Playground Improvements; Entrance Partitions

February 18, 2021

 4,514,400

81.

Hamilton-Wentworth Catholic District School Board

N47-1

Replacement Unit Ventilators; Installation of Wi-Fi Access Points; Rooftop HVAC Unit Replacements; Provide Operable Windows; Install Building Automation Systems; Energy Recovery Ventilator Replacements

February 18, 2021

 6,070,100

82.

Hamilton-Wentworth District School Board

N21-2

HVAC Upgrades (Ventilation)

February 18, 2021

 7,775,000

83.

Hamilton-Wentworth District School Board

N21-1

HVAC Upgrades (Ventilation); Water Bottle Filling Stations; Infrared Water Faucets; Touchless Door Operators

February 18, 2021

 9,445,500

84.

Hastings and Prince Edward District School Board

N29-1

HVAC Upgrades

February 18, 2021

 3,225,000

85.

Hastings and Prince Edward District School Board

N29-2

HVAC Upgrades and Window Replacement

February 18, 2021

 1,850,000

86.

Hastings and Prince Edward District School Board

N29-3

Windows; Handwashing Stations

February 18, 2021

 850,000

87.

Huron-Perth Catholic District School Board

N36-1

HVAC Upgrades; Window Replacements

February 19, 2021

 550,000

88.

Huron-Perth Catholic District School Board

N36-3

Water Bottle Filling Stations

February 19, 2021

 10,000

89.

Huron-Perth Catholic District School Board

N36-2

Water Bottle Filling Stations; HVAC Installation for Cooling

February 19, 2021

 1,140,000

90.

Huron-Superior Catholic District School Board

N31-1

Optimizing Air Quality; Promoting Occupant Health and Safety

February 18, 2021

 2,040,000

91.

Huron-Superior Catholic District School Board

N31-2

Optimizing Air Quality; Promoting Occupant Health and Safety

February 18, 2021

 640,000

92.

Kawartha Pine Ridge District School Board

N14-2

HVAC Upgrades; Hands Free Bottle Filling Project Group

February 18, 2021

 750,000

93.

Kawartha Pine Ridge District School Board

N14-1

Optimize Air Quality Project Group; Hands Free Bottle Filling Project Group

February 18, 2021

 9,400,000

94.

Kawartha Pine Ridge District School Board

N14-3

Replace Portables Project Group

February 18, 2021

 600,000

95.

Keewatin-Patricia District School Board

N5.1-4

Childcare Expansion (Ventilation, Indoor/Outdoor Playground Spaces, Entrances)

February 18, 2021

 150,000

96.

Keewatin-Patricia District School Board

N5.1-1

HVAC Upgrade; Plumbing Fixture

February 18, 2021

 570,000

97.

Keewatin-Patricia District School Board

N5.1-3

Network Hardware Installation (Wi-Fi Access Points)

February 18, 2021

 500,000

98.

Keewatin-Patricia District School Board

N5.1-2

Plumbing Fixture

February 18, 2021

 32,000

99.

Kenora Catholic District School Board

N33.2-1

Handwashing Stations; Water Bottle Filling Stations; Touchless Paper Towel Dispensers; Improved Ventilation; HVAC Control System Upgrades

February 18, 2021

 128,600

100.

Kenora Catholic District School Board

N33.2-2

Water Bottle Filling Stations; Touchless Paper Towel Dispensers

February 19, 2021

 8,540

101.

Lakehead District School Board

N6.1-1

Replace Existing Drinking Fountains with Water Bottle Filling Stations; Retrofitting Open Concept Areas; HVAC Upgrades

February 18, 2021

 1,465,000

102.

Lakehead District School Board

N6.1-2

Replace Existing Drinking Fountains with Water Bottle Filling Stations; Retrofitting Open Concept Areas

February 18, 2021

 410,000

103.

Lambton Kent District School Board

N10-3

HVAC Upgrades and/or Window Replacements

February 18, 2021

 2,900,000

104.

Lambton Kent District School Board

N10-4

HVAC Upgrades and/or Window Replacements

February 18, 2021

 545,000

105.

Lambton Kent District School Board

N10-2

Water Bottle Filling Station Project Group; Wi-Fi Infrastructure Retrofits

February 18, 2021

 142,404

106.

Lambton Kent District School Board

N10-1

Wi-Fi Infrastructure Retrofit; Window Replacements; Water Bottle Filling Stations; Cooling Centres

February 18, 2021

 2,700,781

107.

Limestone District School Board

N27-3

Camera and Other Security Systems; Touchless Door Features; Portable Replacements; HVAC Upgrades; Wiring for Portables

February 18, 2021

 3,331,500

108.

Limestone District School Board

N27-2

HVAC Replacement

February 18, 2021

 500,000

109.

Limestone District School Board

N27-1

HVAC Upgrade and Replacement

February 18, 2021

 1,030,000

110.

Limestone District School Board

N27-4

Security Camera Supporting Physical Distancing and Mask Compliance; HVAC Upgrades

February 18, 2021

 300,000

111.

London District Catholic School Board

N38-1

HVAC/Ventilation Project; Windows Project Group; Daycare Retrofit Group

February 18, 2021

 6,455,500

112.

Near North District School Board

N4-1

Optimizing Air Quality in Schools

February 18, 2021

 2,162,000

113.

Near North District School Board

N4-2

Optimizing Air Quality in Schools

February 18, 2021

 4,061,200

114.

Niagara Catholic District School Board

N50-1

Building Automation Systems; Window Replacements; HVAC Upgrades

February 18, 2021

 7,089,000

115.

Nipissing-Parry Sound Catholic District School Board

N30.2-1

HVAC Upgrades and Water Bottle Filling Stations

February 19, 2021

 4,583,000

116.

Northeastern Catholic District School Board

N30.1-3

ERV Installation in Classrooms and BAS System

February 18, 2021

 1,137,000

117.

Northeastern Catholic District School Board

N30.1-4

ERV Installations in Classrooms and BAS System

February 18, 2021

 817,000

118.

Northeastern Catholic District School Board

N30.1-1

HVAC Upgrades, Water Bottle Filling Stations and Touchless Faucets

February 18, 2021

 365,000

119.

Northeastern Catholic District School Board

N30.1-2

Touchless Water Bottle Filling Stations and Touchless Faucets; HVAC Upgrades

February 18, 2021

 206,000

120.

Northwest Catholic District School Board

N33.1-3

Air Exchangers in Portables

February 18, 2021

 20,000

121.

Northwest Catholic District School Board

N33.1-1

HVAC Upgrades; Water Bottle Water Filling Stations; Touchless Faucets

February 18, 2021

 112,000

122.

Northwest Catholic District School Board

N33.1-2

Touchless Faucets Project Group

February 18, 2021

 34,000

123.

Ottawa-Carleton District School Board

N25-1

HVAC Unit Upgrade - Portables

February 18, 2021

 4,095,000

124.

Ottawa-Carleton District School Board

N25-2

HVAC Upgrades & Window Replacement

February 18, 2021

 9,385,000

125.

Ottawa-Carleton District School Board

N25-3-MR

HVAC Upgrades and Window Replacements

March 18, 2021

 3,095,000

126.

Ottawa-Carleton District School Board

N25-4

Touchless Water Bottle Filling Station; Hold Open Device on Fire Doors; Air Purification System

February 18, 2021

 7,727,000

127.

Ottawa-Carleton District School Board

N25-5-MR

Touchless Water Bottle Filling Stations; Hold Open Devices on Fire Doors; Air Purification Systems

March 18, 2021

 1,298,000

128.

Ottawa Catholic District School Board

N53-3-MR

Gym Divider; Water Bottle Filling Stations; Unit Ventilators

March 18, 2021

 1,155,000

129.

Ottawa Catholic District School Board

N53-2

Heat Pumps; Water Bottle Filling Stations; HVAC RTUs; Air
conditioning

February 18, 2021

 1,505,000

130.

Ottawa Catholic District School Board

N53-1

Unit Ventilator

February 18, 2021

 9,950,000

131.

Ottawa Catholic District School Board

N53-4

Washrooms Upgrade; Portables

February 18, 2021

 1,295,000

132.

Peel District School Board

N19-5

Door Hold-Open Magnets for Clear Hall Passage

February 18, 2021

 7,369,500

133.

Peel District School Board

N19-1

HVAC/Other improvements to Air Quality

February 18, 2021

 9,994,000

134.

Peel District School Board

N19-2

HVAC/Other improvements to Air Quality

February 18, 2021

 9,938,000

135.

Peel District School Board

N19-4

Touch Free Main Entrance Controls

February 18, 2021

 7,259,900

136.

Peel District School Board

N19-3

Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements

February 18, 2021

 7,087,900

137.

Peterborough Victoria Northumberland Clarington Catholic District School Board

N41-1

HVAC and Playground Upgrades; Touchless Handwashing Sinks, Doors and Washrooms; Portable Replacements; Wi-Fi Access Points and Network Infrastructure; Water Bottle Filling Stations; Window Replacements

February 19, 2021

 8,295,337.8

138.

Peterborough Victoria Northumberland Clarington Catholic District School Board

N41-2

Wi-Fi Upgrades; Touchless Doors, Sinks and Washrooms; Water Bottle Filling Stations

February 18, 2021

 61,095.6

139.

Rainbow District School Board

N3-2

Daycare Kitchen

February 18, 2021

 200,000

140.

Rainbow District School Board

N3-4

Ventilation Upgrades; Water Bottle Filling Stations

February 18, 2021

 3,115,000

141.

Rainbow District School Board

N3-3

Ventilation Upgrades; Water Bottle Filling Stations; Handwashing Stations

February 18, 2021

 2,107,500

142.

Rainbow District School Board

N3-1

Window Replacements

February 18, 2021

 2,800,000

143.

Rainy River District School Board

N5.2-2

ERV Ventilation Upgrades

February 18, 2021

 950,000

144.

Rainy River District School Board

N5.2-1

ERV Ventilation Upgrades; Windows

February 18, 2021

 1,100,000

145.

Rainy River District School Board

N5.2-3

Water Bottle Filling Station

February 18, 2021

 6,000

146.

Rainy River District School Board

N5.2-4

Water Bottle Filling Station

February 18, 2021

 12,000

147.

Renfrew County Catholic District School Board

N54-1

HVAC

February 18, 2021

 1,115,000

148.

Renfrew County Catholic District School Board

N54-3

HVAC Upgrades; Portable Replacement; Installation of Water Bottle Filling Stations

February 18, 2021

 1,907,000

149.

Renfrew County Catholic District School Board

N54-4

HVAC Upgrades; Portable Replacements; Install Water Bottle Filling Stations

February 19, 2021

 1,539,000

150.

Renfrew County Catholic District School Board

N54-2

Window Replacements

February 18, 2021

 250,000

151.

Renfrew County District School Board

N28-2

HVAC System UV Treatment; HVAC Duct Sealing

February 18, 2021

 1,502,901

152.

Renfrew County District School Board

N28-1

HVAC System UV Treatment; HVAC Duct Sealing; Ventilation

February 18, 2021

 3,045,055

153.

Simcoe County District School Board

N17-1

Installation of Mechanical Ventilation Systems; Ventilation Improvements; Portable Unit Ventilators; Portable Replacements; Portable Refurbishments

February 18, 2021

 9,990,000

154.

Simcoe County District School Board

N17-2

Ventilation Improvements; Sanitizing Stations

February 18, 2021

 3,935,000

155.

Simcoe County District School Board

N17-3

Water Bottle Filling Stations; Touchless Door Open Devices

February 18, 2021

 3,310,000

156.

Simcoe Muskoka Catholic District School Board

N44-1

HVAC Upgrades for Schools and Portables; Purchase of New Portables; Window Replacements

February 26, 2021

 9,939,706

157.

Simcoe Muskoka Catholic District School Board

N44-2

Water Bottle Filling Stations

February 18, 2021

 66,700

158.

St. Clair Catholic District School Board

N39-1

HVAC Upgrades for Schools and Childcare; Water Bottle Filling Stations; Window Replacements

February 18, 2021

 3,718,627.7

159.

Sudbury Catholic District School Board

N32-2

Handwashing Upgrades and Water Bottle Fill Station Installation

February 18, 2021

 94,000

160.

Sudbury Catholic District School Board

N32-3

Handwashing Upgrades and Water Bottle Filling Stations

February 18, 2021

 1,000

161.

Sudbury Catholic District School Board

N32-1

HVAC Upgrades

February 18, 2021

 1,555,000

162.

Superior-Greenstone District School Board

N6.2-3

Handwashing Station & Water Bottle Filling Station; HVAC - Ventilation, Filtration & UV Disinfecting; Safety Retrofits - Isolation Room Ventilation; Window Replacement

February 18, 2021

 3,292,000

163.

Superior North Catholic District School Board

N34.2-1

Ventilation System Upgrades; Ultraviolet Germicidal Irradiation Systems; Water Bottle Filling Stations

February 18, 2021

 1,810,500

164.

Thames Valley District School Board

N11-2

Secured Access; Wi-Fi Access Point Enhancements (Outdoor); Fixed Water Bottle Filling Stations

February 18, 2021

 5,846,000

165.

Thames Valley District School Board

N11-3

Secured Access; Wi-Fi Access Point Enhancements (Outdoor); Fixed Water Bottle Filling Stations

February 18, 2021

 217,500

166.

Thames Valley District School Board

N11-1

Wi-Fi Access Point Enhancements (Interior); Building Automation Upgrades; Ventilation Upgrades

February 18, 2021

 4,210,500

167.

Thunder Bay Catholic District School Board

N34.1-1

Water Bottle Filling Stations; Handwashing Stations; New Boiler/Heating System

February 19, 2021

 980,000

168.

Toronto Catholic District School Board

N40-1

HVAC Replacements and Portable Ventilation Upgrades

February 18, 2021

 4,809,585

169.

Toronto Catholic District School Board

N40-3

Outdoor Classrooms/Playgrounds; Wi-Fi Access points and Network Infrastructure; Child Care Space (install separate entrance, upgrades to washrooms and outdoor playground)

February 19, 2021

 9,295,581.8

170.

Toronto Catholic District School Board

N40-2

Upgrade Handwashing Equipment; Window Replacements

February 18, 2021

 6,566,752

171.

Toronto Catholic District School Board

N40-4

Water Bottle Filling Stations; Cooling Centres; New Mechanical Ventilation Systems

February 18, 2021

 5,089,500

172.

Toronto District School Board

N12-10

Classroom Enclosures

February 18, 2021

 6,457,000

173.

Toronto District School Board

N12-1

Early Learning Child Care Centres; Kindergarten Outdoor Areas

February 18, 2021

 955,000

174.

Toronto District School Board

N12-6

Handwashing Upgrades; Outdoor Learning Features; HVAC Upgrades; New Portables; Water Bottle Filling Stations

February 18, 2021

 9,440,327

175.

Toronto District School Board

N12-5

HVAC (BAS) Upgrades

February 18, 2021

 9,912,508

176.

Toronto District School Board

N12-2

HVAC Upgrades

February 18, 2021

 9,900,000

177.

Toronto District School Board

N12-3

HVAC Upgrades

February 18, 2021

 9,900,000

178.

Toronto District School Board

N12-4

HVAC Upgrades (Schools and Portables); Touchless Door Operators

February 18, 2021

 8,837,000

179.

Toronto District School Board

N12-8

Hybrid Learning Classroom Implementation Project – Wi-Fi Access Points

February 18, 2021

 9,495,327

180.

Toronto District School Board

N12-9

Hybrid Learning Classroom Implementation Project – Wi-Fi Access Points

February 18, 2021

 6,863,210

181.

Toronto District School Board

N12-7

Outdoor Playground Upgrades (Armour Stone and Accessible Pathways), Windows

February 18, 2021

 9,880,000

182.

Trillium Lakelands District School Board

N15-2

Air Handling Upgrades; Ventilation Systems and Cooling Centres

February 18, 2021

 75,000

183.

Trillium Lakelands District School Board

N15-1

Air Handling Upgrades; Ventilation Systems and Cooling Centres, Windows

February 18, 2021

 6,685,000

184.

Trillium Lakelands District School Board

N15-3

Hydration / Handwashing Project Group; Remote Learning Group (Portable Replacement)

February 26, 2021

 600,000

185.

Trillium Lakelands District School Board

N15-4

Installation of Water Bottle Filling Stations and Handwashing Upgrades (Faucets and/or Sinks)

February 18, 2021

 125,000

186.

Upper Canada District School Board

N26-4

Automatic Door Opener Project Group

February 18, 2021

 273,000

187.

Upper Canada District School Board

N26-3

Automatic Door Opener; Video Camera Childcare Project Group; Washroom Project Group; Site Project Group

February 18, 2021

 3,335,315

188.

Upper Canada District School Board

N26-1

HVAC Upgrade, Water Bottle Filling Station Installation, Portable Replacement, Retrofits, Wi-Fi Installation, Window Replacement

February 18, 2021

 6,454,900

189.

Upper Canada District School Board

N26-2

Water Bottle Filling Station Project Group

February 18, 2021

 217,000

190.

Upper Grand District School Board

N18-3

Portable Replacements; Ventilation Upgrades; Hand Hygiene Project Group

February 18, 2021

 3,532,000

191.

Upper Grand District School Board

N18-2

Touchpoint Reduction Project Group

February 18, 2021

 24,000

192.

Upper Grand District School Board

N18-1

Touchpoint Reductions; HVAC Upgrades; Portable Unit Ventilator Replacements

February 18, 2021

 7,413,000

193.

Waterloo Catholic District School Board

N49-2

Automatic Door Openers; HVAC Upgrades; Handwashing Stations; Separation Barriers

February 18, 2021

 212,000

194.

Waterloo Catholic District School Board

N49-1

Portable Replacement; HVAC Upgrades in Schools and Portables; Window Replacements

February 26, 2021

 7,950,000

195.

Waterloo Region District School Board

N24-1

HVAC Upgrades; Upgrading Wireless Access Points; Window Replacement; Washroom Upgrades; Installing Cooling / Air Conditioning Units; Room Partition Replacement

February 18, 2021

 9,997,600

196.

Waterloo Region District School Board

N24-2

Installing Mechanical Ventilation in Buildings Where None Currently Exist; Window Repair or Replacement for Fresh Air Intake

February 18, 2021

 9,830,000

197.

Waterloo Region District School Board

N24-3

Installing Mechanical Ventilation in Buildings Where None Currently Exist

February 18, 2021

 6,185,000

198.

Waterloo Region District School Board

N24-4

New Playground Space to Separate Groups; Safety Barriers; Water Bottle Filling stations

February 19, 2021

 219,000

199.

Wellington Catholic District School Board

N48-1

Touchless Washroom Faucets and Flush Valves; Water Bottle Filling Stations; HVAC Upgrades

February 18, 2021

 1,999,490

200.

Windsor-Essex Catholic District School Board

N37-2

HVAC Upgrades, Window Replacements; Purchase of New Portables; Water Bottle Filling Stations; PA System, Vestibules, Interior Retrofits

February 26, 2021

 4,036,000

201.

Windsor-Essex Catholic District School Board

N37-1

Portable Classroom HVAC Replacements; Wall Updates for Open Concept Sites.

February 18, 2021

 1,845,000

202.

York Catholic District School Board

N42-2

HVAC Upgrades in Schools and Portables; Window Replacements; Portable Replacements

February 18, 2021

 8,021,000

203.

York Catholic District School Board

N42-1

HVAC Upgrades; Water Bottle Filling Stations; Gym Divider Walls

February 18, 2021

 9,561,500

204.

York Region District School Board

N16-1

Cooling Centres; Window Replacements

February 18, 2021

 5,150,000

205.

York Region District School Board

N16-2

HVAC System in Portable Classrooms

February 18, 2021

 5,200,000

206.

York Region District School Board

N16-3

HVAC Upgrades (Schools); Wi-Fi Access Points and Network Switches; Security Access (Communication/Paging system)

February 18, 2021

 4,769,007

 

Commencement

4. This Regulation comes into force on the day it is filed.

 

Français